Announcement
Collapse
No announcement yet.
Search Result
Collapse
107 results in 0.0101 seconds.
Keywords
Members
Tags
-
Structural Rebar Scheduling
Hi All, I am trying to do precast shop drawings, Modeling the rebar in order to create and bending schedule, I have mainly two types of bars (hooks) 90...3 PhotosLast edited by Mortimer_70; May 16, 2022, 01:11 AM.
-
using cumulitive area in a schedule
Is there a way to make a schedule that adds room areas together so that we can calculate the number of required plumbing fixtures based on total area...
-
Revit + Signage Packages. Thoughts?
Has anyone found a good workflow to incorporate Signage Packages into Revit - either with manual placing of signage families - or simply through scheduling...
-
Copying a schedule from 2017 up to 2018?
I'm working on a project in Revit MEP 2018. I have a schedule that I want to copy in a Revit MEP 2017 project. Is there a way to copy the schedule over...
-
Formula text
Is it possible to connect text in a formula? I'm made a schedule, that gives a unit to my items, but I want to make a new column with a formula that connects...
-
Wrong schedule formula calculation
Hello
I'm trying to calculate something with a Revit schedule, but the calculated value i wrong?
I've made to parameters called...
-
Design Options in Rvtlinks & Schedules
OK Everybody, this is my first post, and confess I am pretty new to Revit, but not new to CAD. Just putting that out there.
I have been having...
-
Schedule Column Freeze
I cannot find the functionality of this "Freeze" feature. Anyone know what this does? (Appears in 2020 - not in 2019 or 2018)
...Last edited by TFuller; April 11, 2019, 01:17 PM.
-
Need to schedule # of nested instances within family
Hello All,
Apologies if the title was unclear. Have a vertical rod stiffener family with nested stiffener family. Depending how long...
-
Rebar Quantity not correct in Schedule
Hi,
I've got a bit of an anomaly with my rebar schedule where the quantity of bars isn't correct.
I've attached a screen shot...
-
Schedules - adding together two fields in the same row
Hi all,
PLease see attached:
For each flat I wish to add together 'travel distance' and 'stairescape' add give a total in the...
-
Round and if formula in schedule
Hey I'm wondering if someone can help me with a schedule formula i'm struggling with.
I have two separate formulas i'm trying to combine into one....
-
schedule: calculating ordertotal with spares
Dear all,
This is a tricky one. I am currently making productionsheets for parts and I want to incorporate spares. For example: I need 570...
Monumetric Footer In-screen
Collapse