We have some contractors who insist on one or the other, so they are not th eproblem.
The problem comes when we issue everything "for information" as alphabetic, and then once the pack is ready to go, we switch over to Numeric.
This isnt a problem as Revit will mix and macth. The problem I am having is that when I do this, and start numeric from "1", it sticks the number 1 right at the top of my list of revisions on the dwg sheet. I want to append it to the end of the list of alphabetic revisions..?
Have I missed a check box or am I doing something stupid..
Cheers
The problem comes when we issue everything "for information" as alphabetic, and then once the pack is ready to go, we switch over to Numeric.
This isnt a problem as Revit will mix and macth. The problem I am having is that when I do this, and start numeric from "1", it sticks the number 1 right at the top of my list of revisions on the dwg sheet. I want to append it to the end of the list of alphabetic revisions..?
Have I missed a check box or am I doing something stupid..
Cheers
Comment