I am trying to calculate (divide) totals in my schedule. See image below. I am trying to have the totals from column 2 and column 3 to divide into the glazing percentage column.
I manually entered 16.2% but was curious if there is a way to calculate this within the schedule?
I manually entered 16.2% but was curious if there is a way to calculate this within the schedule?