I have a number of linked files into a master file where I setup the drawing sheet and tag and dimension items.
When showing window tags in the Revit master file elevations there are 6 or so of the same tags over the top of each other and also the window schedule created in the master file lists 6 of each window.
The plans in the master file only show 1 tag per window.
As a cross check I went back into the linked files and did a window schedule and it was fine so it must ne something in the linking process
When showing window tags in the Revit master file elevations there are 6 or so of the same tags over the top of each other and also the window schedule created in the master file lists 6 of each window.
The plans in the master file only show 1 tag per window.
As a cross check I went back into the linked files and did a window schedule and it was fine so it must ne something in the linking process