Hi all,
I need some input here... feeling a little lost! I am working on a project that has 7 buildings and one site. I located all buildings in the site model and set up the shared coordinates. The site model hosts all the CAD civil and landscape files and the topo. I am using a separate annotation model where I am linking all my Revit models and copy/monitoring the grids and levels. The site is sloping so all buildings are at different elevations.
I started by linking my first building (A) by shared coordinates into the annotation model and copy monitored the grids and levels. Level 1 is 0' -0". All good. When I linked building B, and copy monitored grids and levels, Bldg. B's level 1 is no longer 0'-0" as it is if I open Bldg. B model, but it is 5'-11 3/32". I am guessing this is because the Annotation model is picking Building A's level 1 (0'-0") as reference and since building B is 5'-11 3/32" higher, it shows that Building B's level 1 is at 5'-11 3/32".
Is there a way to make Revit reference each level 1 to its own 0'-0" ( like when I open any of my building models) instead of Building A's level 1?
Any help will be very appreciated!
Thank you so much!
I need some input here... feeling a little lost! I am working on a project that has 7 buildings and one site. I located all buildings in the site model and set up the shared coordinates. The site model hosts all the CAD civil and landscape files and the topo. I am using a separate annotation model where I am linking all my Revit models and copy/monitoring the grids and levels. The site is sloping so all buildings are at different elevations.
I started by linking my first building (A) by shared coordinates into the annotation model and copy monitored the grids and levels. Level 1 is 0' -0". All good. When I linked building B, and copy monitored grids and levels, Bldg. B's level 1 is no longer 0'-0" as it is if I open Bldg. B model, but it is 5'-11 3/32". I am guessing this is because the Annotation model is picking Building A's level 1 (0'-0") as reference and since building B is 5'-11 3/32" higher, it shows that Building B's level 1 is at 5'-11 3/32".
Is there a way to make Revit reference each level 1 to its own 0'-0" ( like when I open any of my building models) instead of Building A's level 1?
Any help will be very appreciated!
Thank you so much!