Not all AutoCAD elements are real in Revit and a proxygraphics messages suggests 3rd party or smart elements are present. In the worst case those elements are not even displayed in Revit at all.
Sometimes exploding the elements in the DWG file is sufficient to reduce them to a basic AutoCAD element Revit does recognize.
Announcement
Collapse
No announcement yet.
Spot Coordinate dimension can't touch some linked DWG elements
Collapse
X
-
Spot Coordinate dimension can't touch some linked DWG elements
My DWG survey is linked into my Revit file.
I can use Annotate > Dimension > Aligned to place dimensions on Lines and Polylines in the linked DWG. This is good.
However Annotate > Dimension > Spot Coordinate only allows me to select some of the Lines and Polylines.
With my limited knowledge of Autocad I can see that all layers are On, Unfrozen and Unlocked. Hatches been removed and Blocks exploded.
The DWG survey has been "prepared" by (amongst other tasks) transposing all elements to near the Origin point, to be within the 20 mile limit.
When in Revit, even with a pair of two identical parallel Lines in the linked DWG, I can place a Spot Coordinate on one but not on the other.
Why might the be the case? What setting do I have to change? Is it in Autocad or is it in Revit?
Does it have something to do with the series of messages I get when I open the file with Autocad?:
* This DWG file was saved by an application that was not developed or licensed by Autodesk... (Continue)
* One or more SHX file are missing.....(Ignore)
* ...Proxy Graphics... (Show proxy graphics)
Thanking you in advance.Tags: None
Related Topics
Collapse
-
Hi,
Hope someone knows a good practice to get link dwg into Revit. Some DWGs when linked turn up distorted in revit. I have tried exploding,...August 22, 2016, 04:24 PM -
Hi Guys
I have overlayed a CAD DWG File onto an elevation. When I zoom in and my zoon "crops" it the DWG dissapears unless I...May 15, 2012, 02:13 PM -
Can anyone tell me why a Linked DWG file would only show in certain areas of a RCP.
The ceilings are 2700mm across the floor...July 7, 2016, 08:08 AM -
Hello All
Need your expert guidance. At my wits end at the moment:banghead:, I need to deliver a tender package next week and the dwg files just...January 2, 2020, 08:12 PM -
Hi
Revit 2012 can't find a linked dwg anymore. When I try to reload it, Revit says the file doesn't exist. There is an other linked dwg...August 26, 2011, 03:13 PM
Monumetric Footer In-screen
Collapse
Leave a comment: