I have drawn an existing tenant plan with overhead items shown as dashed in the existing phase. When I switch to the new construction phase for new elements, the dashed lines turn solid. I would like them to remain dashed. Is this possible in the new construction phase?
Announcement
Collapse
No announcement yet.
Line Types in Phases
Collapse
X
Related Topics
Collapse
-
In my typical ADA toilet & grab bar family I have the ADA clearances sketched in with detail lines so they show up on plans to keep everyone happy...March 21, 2012, 05:49 PM
-
I am doing a project with an existing phase and a new phase. I am having issue with the way in which hidden (dashed lines) look in the new floor plan....March 2, 2017, 05:11 PM
-
I am new to revit and traditionally in CAD we display existing walls as basic walls filled with hatch, and then all proposed construction gets studs/gwb/siding....April 10, 2020, 07:44 PM
-
So currently in my project I have three phases set up.
Phase 1 - Existing
Phase 2 - POD 3
Phase 3 - Future
I have phased...-
Channel: MEP - General
July 1, 2013, 10:56 PM -
-
I have a project where I am trying to work on the existing elements, while designating them to be either existing, or demolition. My phase settings are...November 4, 2020, 09:14 PM