I'm looking to copy elements from a linked model to other floors and have them retain their links. Is this possible?
We are getting weekly Revit models from the architect that I have linked into my MEP project. There are a lot of typical floors in the project, but architect only drew a lot of the typical elements such as ceilings on one level. I'd like to copy some of these elements up these typical levels I am working on but still retain. Only problem is, when I do this, I believe they are lost from the link when a new architectural model link is saved over. Weekly models makes this very annoying to do every time. Is there a better way?
We are getting weekly Revit models from the architect that I have linked into my MEP project. There are a lot of typical floors in the project, but architect only drew a lot of the typical elements such as ceilings on one level. I'd like to copy some of these elements up these typical levels I am working on but still retain. Only problem is, when I do this, I believe they are lost from the link when a new architectural model link is saved over. Weekly models makes this very annoying to do every time. Is there a better way?
Comment