I am working on a house where I have two plans. Plan #1 is showing existing conditions and plan #2 is showing new construction. The existing floor plans have the phase filer: 'show all, and the phase: "01-existing" For the new construction drawings, I have the phasing as "03-new construction" and the phase filter as "show previous + new"
The floor plans are showing the appropriate things and I am not having issues with this.
I am having a problem with the phasing of the rooms.
The issue i am having, is that on the new construction plans, the rooms that I made no changes to are showing in the wrong phase "03- new construction" despite being created in the existing phase. This is causing problems with my schedules, because I just want to simply apply a phase filter and just show rooms that were newly created in the new construction plans and leave out existing rooms.
It look as though when I made the new floor plan, the phasing of the rooms changed from existing to new, by virtue of being on the new plans.
Question: how can I prevent the existing rooms from going into the phase "03-new construction" on the new plans? they're existing, untouched rooms, i am not sure why they're showing up in the wrong phase. Similar to the way existing, unmodified walls show up in the new construction plan, I want the rooms to do the same.
The floor plans are showing the appropriate things and I am not having issues with this.
I am having a problem with the phasing of the rooms.
The issue i am having, is that on the new construction plans, the rooms that I made no changes to are showing in the wrong phase "03- new construction" despite being created in the existing phase. This is causing problems with my schedules, because I just want to simply apply a phase filter and just show rooms that were newly created in the new construction plans and leave out existing rooms.
It look as though when I made the new floor plan, the phasing of the rooms changed from existing to new, by virtue of being on the new plans.
Question: how can I prevent the existing rooms from going into the phase "03-new construction" on the new plans? they're existing, untouched rooms, i am not sure why they're showing up in the wrong phase. Similar to the way existing, unmodified walls show up in the new construction plan, I want the rooms to do the same.
Comment