Hi,
If i have two footings one is (F1=1800x1600x600) and the other is (F2=1000*800*300) and i already built the rebar for the F1
what is the best way to transfer the rebar from F1 to F2 without redrawing it again for F2?
If i have two footings one is (F1=1800x1600x600) and the other is (F2=1000*800*300) and i already built the rebar for the F1
what is the best way to transfer the rebar from F1 to F2 without redrawing it again for F2?