My engineer wanted me to set slab elevation points on a parking structure slab for drainage.
This is my first parking structure and I'm not sure exactly what's happening.
When I set the elevations (0, -8", and -16") at the locations my engineer requested, Revit added lines to the slab... not where my engineer wanted them.
I'd rather not reset my slab and "dummy" it; but, I'm not sure what else I can do.
(In the attached pic, the black lines are what Revit put in. The Red dashed are where my Engineer wants them.)
This is my first parking structure and I'm not sure exactly what's happening.
When I set the elevations (0, -8", and -16") at the locations my engineer requested, Revit added lines to the slab... not where my engineer wanted them.
I'd rather not reset my slab and "dummy" it; but, I'm not sure what else I can do.
(In the attached pic, the black lines are what Revit put in. The Red dashed are where my Engineer wants them.)
Comment