You are currently viewing as a guest which gives you limited access to view attachments, ask questions and access other features. To get full access to all the features, please register for an account. Registration is fast, simple and absolutely free, so please register today! If you have any problems with the registration process or your account login, please contact us.
I've divided the wall into parts and would like to have the gypsum board split between the 2 floors with a gap at the floor level. I can't seem to find a way to delete the part in the middle. Am I missing something?
I've divided the wall into parts and would like to have the gypsum board split between the 2 floors with a gap at the floor level. I can't seem to find a way to delete the part in the middle. Am I missing something?
Can't delete the part in the middle, but you can hide it.
Thanks Scott. That's what I was thinking would be the answer. Unfortunately that doesn't get rid of that piece of board if your doing a material take off. I suppose I could change that piece to be some other material as well. That's starting to feel like a lot of steps. I guess I have to weight that with just adding gypsum bd as separate walls at each level and joining them with the continuous wall behind.
Or make an instance project parameter in the parts category and fill it on the fly when select that part with a non value before you hide the thing. Than adapt your schedule. Or move it on another nonscheduled phase.
I had created a new deployment for RAC 2012 . The deployed image is created successfully but when I m going install it ie Rollback. It shows a below error...
Comment