    Is it possible to change the predefined values in new sheets, like the Author, Checker, Approver ?

    And can the default date format be changed from mm/dd/yy to dd/mm/yyyy ?
    Klaus Munkholm
    "Do. Or do not. There is no try."

    #2
    I am pretty sure you can do both. I cant look right now though i am on a deadline.
    -Alex Cunningham

    Comment


      #3
      Re-reading my question, and realizing that I may not have been clear enough.

      Example:
      When i create a new sheet, I want the predefined field for Author to read: "MyInit", and not "Author".

      Example:
      When i create a new sheet, I want the predefined field for date to read "dd/mm/yyyy" with the current date, not mm/dd/yy.

      I´m getting tired of changing these values manually for each and every sheet that I create :banghead:
      Klaus Munkholm
      "Do. Or do not. There is no try."

      Comment


        #4
        make those two parameters type parameters not instance... maybe
        then it would be controled by Project Information
        -Alex Cunningham

        Comment


          #5
          Those are build in parameters, but I coud actually choose not to use them, and add project paramters, which would actually work for Author, Checker and Approver! Why did I never think of that... thank you :beer:

          It wont work for the date field though, as I need it to pick up the actual date each sheet was created, not necessarily being the same date...
          Klaus Munkholm
          "Do. Or do not. There is no try."

          Comment


            #6
            i seem to remember somewhere the date format value. I cant seem to find it thought. maybe someone else will remember. its a setting i think
            -Alex Cunningham

            Comment


              #7
              Originally posted by Alex Cunningham View Post
              i seem to remember somewhere the date format value. I cant seem to find it thought. maybe someone else will remember. its a setting i think
              The format for automatic dates in Revit such as the Date/Time Stamp label, is read from your Windows settings.
              Start > Control panel > Regional and Language options > Regional options tab > Customize > Date tab > select a new short and/or long date format.
              Freelance BIM Provider at Autodesk Services Marketplace | Linkedin

              Comment


                #8
                and there you go... simple
                -Alex Cunningham

                Comment


                  #9
                  Thanks guys, but that´s not it... my control panel setting are like i´d want them to be, but those settings do not get picked up by Revit.
                  Could it be because my OS is in Danish ? (Win 7, 64 pro)

                  Have you verified that changes in control panel affect revit on your systems ?
                  Klaus Munkholm
                  "Do. Or do not. There is no try."

                  Comment


                    #10
                    Originally posted by Munkholm View Post
                    ...Have you verified that changes in control panel affect revit on your systems ?
                    Yes, Klaus, changing those settings in Windows does have an effect in Revit. I tested it before posting. But, as I said, in my reply, it works for automatic dates such as the Date/Time Stamp label. Which date are your trying to change?