We have a new building that we expect to have a future expansion. When the engineer designed the building in RAM, he designed the entire building, with future expansion included.
When I brought it into Revit, I created a new phase, Future Expansion; it's placement is after New Construction. I then took all the steel and foundations that we expect to be in the future expansion and changed it's Phase to Future Expansion.
Everything was going smoothly until I tried to place a wall footing (for current, New Construction phase) in an area where there are two future column footings.
I'm not seeing the full length of my wall footing. It seems to be clipped by the Future Expansion columnn footings.
Anybody have any ideas on how to solve this?
When I brought it into Revit, I created a new phase, Future Expansion; it's placement is after New Construction. I then took all the steel and foundations that we expect to be in the future expansion and changed it's Phase to Future Expansion.
Everything was going smoothly until I tried to place a wall footing (for current, New Construction phase) in an area where there are two future column footings.
I'm not seeing the full length of my wall footing. It seems to be clipped by the Future Expansion columnn footings.
Anybody have any ideas on how to solve this?
Comment