    Phasing and Rooms

    Hi All,

    I'm currently working on a project that is Phased into 7 New consturction Phases. I want to show Room Tags/Rooms from a previous phase in the current phase. For example: rooms from phase 3 in a view that has phase 7 as the current showing phase. Is the best way to go about doing this just simply copying the room from phase 3 into phase 7 or is there a way I can get the phase 3 rooms to show in phase 7?

    #2
    I am in a similar situation, I have a project with 4 construction phases. The client insists on it. I do not know of an easy way to get around it. I have copied/pasted the rooms from each phase into the next phase. I, too, am open to suggestions.

    Comment


      #3
      There is one way to do it, but its kind of messy and definitely cheating.
      Using ncebula's example:
      • Duplicate (with detailing) the Floor Plan from Phase 3.
      • In this new plan, turn off all of the Model Categories except Rooms
      • Turn off all of the Annotation Categories except Room Tags.
      • You should be left with a View sowing nothing but Room Tags from Phase 3.
      • Now, in Phase 7, turn Off the Room Tags.
      • Finally, place Phase 7 on a Sheet and then drag the Phase 3 View on top of it.
      • You'll see the green alignment line when they are lined up right.


      You'll have to be careful to ensure that the Phase 3 Tags View gets any changes you make to Phase 3. The simplest way to do this is to Tag All Not Tagged again in that View.
      Dave Plumb
      BWBR Architects; St Paul, MN

      CADsplaining: When a BIM rookie tells you how you should have done something.

      Comment


        #4
        Dave's suggestion is by far the best. Sorry to say this btw, but it's true...
        Copy-pasting the rooms through Phases will give you massive coordination trouble if one or more rooms should change / get merged or deleted. You'd have to remember to do this inall Phases.
        Martijn de Riet
        Professional Revit Consultant | Revit API Developer
        MdR Advies
        Planta1 Revit Online Consulting

        Comment


          #5
          Yea I read dave's suggestion later on at another forum and figured the copy/paste for each room into different phases would be a headache with coordination. Not to mention room schedules.