    Does anybody know a way to intelligently link a detail number into a schedule. The example I'm working with is our door schedule where we have fields for the jamb, head and sill details.

    Is there a way to, at best, have detail views that are associated with a family (ex: a door family) and can be called on in a schedule if they are visible on a sheet; or, at worst, have the field as a drop down box that lists the views that I can choose from?

  2. #2
    Administrator Ian.Kidston's Avatar
    Join Date
    December 7, 2010
    Location
    Melbourne, Australia
    Posts
    1,145
    Current Local Time
    05:46 PM
    Hi Brakware,

    I am happy for one of the gurus to correct me, but to the best of my knowledge there is no way to achieve this within revit alone.

    The are a number of manual methods - spreadsheet to detail view shcedule and the align the detail view schedule adjacent to the door schedule etc. but as I say, I don't think it can be done within Revit alone.

    fwiw. Quick Table by Tools4Revit is the best spreadsheet to revit converter I have found.

    It is available from http://www.karelcad.com.au/Tools4Revit.htm well worth a look.

    Cheers,

  3. #3
    Moderator
    "I am NOT a Revit tutor!"
    Dave Jones's Avatar
    Join Date
    December 7, 2010
    Location
    San Luis Obispo, California USA
    Posts
    4,493
    Current Local Time
    12:46 AM
    Quote Originally Posted by Ian.Kidston View Post
    Hi Brakware,

    I am happy for one of the gurus to correct me, but to the best of my knowledge there is no way to achieve this within revit alone.

    The are a number of manual methods - spreadsheet to detail view shcedule and the align the detail view schedule adjacent to the door schedule etc. but as I say, I don't think it can be done within Revit alone.

    fwiw. Quick Table by Tools4Revit is the best spreadsheet to revit converter I have found.

    It is available from http://www.karelcad.com.au/Tools4Revit.htm well worth a look.

    Cheers,
    I mentioned in another thread today that I use Dotsoft's XL2CAD software to do what Tools4Revit does. The disadvantage in XL2CAD use is that it requires AutoCAD as a "middle man" but the advantage is that once you have your spreadsheet in a Revit drafting view via an Acad link you never need to fiddle with it in Revit (or Acad). Just change the spreadsheet in Excel and it automatically updates in Acad and then updates in Revit.

  4. #4
    Forum Co-Founder Alfredo Medina's Avatar
    Join Date
    December 7, 2010
    Location
    Orlando, FL, USA
    Posts
    3,101
    Current Local Time
    03:46 AM
    Quote Originally Posted by brakware View Post
    Does anybody know a way to intelligently link a detail number into a schedule. The example I'm working with is our door schedule where we have fields for the jamb, head and sill details.

    ...
    Link the detail number? No. Link a view to the schedule? No. Probably what gets you closer to having a list of details is a key schedule. Make a list of your details as a key schedule. Then, include the key field into the door schedule. At least, this will give a list of your details to choose from, but they will be only references. There won´t be any automatic association with the actual views.

  5. #5
    Forum Co-Founder Twiceroadsfool's Avatar
    Join Date
    December 7, 2010
    Location
    Dallas, TX
    Posts
    10,205
    Current Local Time
    02:46 AM
    Quote Originally Posted by Alfredo Medina View Post
    Link the detail number? No. Link a view to the schedule? No. Probably what gets you closer to having a list of details is a key schedule. Make a list of your details as a key schedule. Then, include the key field into the door schedule. At least, this will give a list of your details to choose from, but they will be only references. There won´t be any automatic association with the actual views.
    Exactly what i was going to suggest. Its still completely up to the user, but so are the extensions and tools that run. And generally, i find tools and add ons to be not worth the hassle, unless they provide a LARGE (and i do mean large) benefit to the project team, for the investment of support and installation plus purchase. The door renumberer, sheet count, blah blah, just dont make the cut, for me.

    Using an add on for this can still be wrong, if you forget to run the add on. As long as thats the case, you might as well just have a key schedule to go manually check, since its on you as a user anyway.

  6. #6
    New Member brakware's Avatar
    Join Date
    December 13, 2010
    Posts
    3
    Current Local Time
    12:46 AM
    Thanks for the tips. I think that, if we decide in our office to not scrap including detail view numbers in our schedules, the key schedule might be the best bet.

    I do think that this is another one of those areas where Revit is sorely lacking. They like to stress how it's a databse, and, yet, there are so many simple things that you can do with a database that you can't seem to do with Revit. You should be able to have a "detail view" parameter type that you can relate to another view in the project. Revit already sees each view as a unique object, so there's no reason it shouldn't be able to be referenced in a parameter and return null if the view ceases to exist or is unassigned.

    Now, off of my soapbox... I will try out the key schedule idea. It will take more coordination than I would like, but... oh well.

  7. #7
    Member
    Join Date
    December 9, 2010
    Posts
    118
    Current Local Time
    12:46 AM
    Is there a way to create a text symbol similar to a callout that references a previously created view? In that respect you could drop the symbol (that's just text) and tie it to a detail view. You could then place that little bit of text into a paragraph string or schedule. While not perfect, and requires you to move the symbol around if the text changes around it, but at least you'd know that you were tied to the correct detail reference.

  8. #8
    Junior Member
    Join Date
    December 7, 2010
    Posts
    30
    Current Local Time
    03:46 AM
    I see were you are going with this and I was thinking something similar. After messing around quickly its not possible to have multiple callout heads in a project. So you could edit a callout head to do what you want but then every callout head would look that way.

  9. #9
    Forum Addict sdbrownaia's Avatar
    Join Date
    December 20, 2010
    Posts
    1,058
    Current Local Time
    03:46 AM
    I've removed the detail ref. from my schedules and no one has missed them. We do the elevations of the full door type asseblies and call out the details from them. We show a little of the surrounding walls and trim. this way its true bim and no user error. So if there is the same type of door in more than one type of wall we give it a new type number and a new elevation and schedule it. You end up with a few more elevations than the traditional Frame and panel elevations, but not enough to make it worth keying in the details into a schedule.

Similar Threads

  1. Phasing and Room Numbers
    By Patrick in forum Architecture and General Revit Questions
    Replies: 10
    Last Post: August 5th, 2011, 03:19 AM
  2. Reinforcement In Schedules
    By Ali Akbar in forum Structure - General Questions
    Replies: 9
    Last Post: May 27th, 2011, 04:16 PM
  3. Room Schedules
    By stl4310 in forum Architecture and General Revit Questions
    Replies: 2
    Last Post: March 29th, 2011, 08:39 PM
  4. Schedules within Schedules.
    By Alex Cunningham in forum Architecture and General Revit Questions
    Replies: 7
    Last Post: March 16th, 2011, 03:02 PM
  5. How important are build numbers?
    By jasonbailly in forum Architecture and General Revit Questions
    Replies: 0
    Last Post: March 10th, 2011, 10:09 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •