    <Hands-Up>
    I've never paid stairs much attention
    </Hands-Up>

    ...but as I've just had a eureka moment to bestow upon our system families our "Spec Ref" SP, (which gets tied to <Keynote> in our component families by formula) so I can tie their <Keynote> using Dynamo (so we can tag our specification reference using a category tag)...

    Q. What gives with the "Railing Hardware" and "Railing Handrail" schedule types?

    Aside from "Hardware" actually being "Supports" (!?) neither seem to schedule anything.

    I've a railing, featuring both, right infront of me - and yes, my schedules aren't filtered, and are looking at the right phase (not that the Supports, sorry Hardware, schedule appears to respect phases)


    Curious.

  2.    #2
    Moderator snowyweston's Avatar
    Join Date
    December 21, 2010
    Location
    C.LONDON
    Posts
    3,863
    Current Local Time
    05:15 AM
    ...and yeah, I opened with "Stairs" so should probably also quiz about them.

    Anyone ever tried to schedule a Project Parameter applied to Stair Landings, Runs and/or Supports?

    You can certainly add one, and it'll show in the Types Properties, but it doesn't come up in the schedule's field list - at least not for me at the moment.


    ...perhaps Dynamo listing 2No. "Stairs - Supports" under it's category list is trying to tell me I should've left this can of worms in the shop.
    Last edited by snowyweston; November 13th, 2017 at 04:05 PM.

  3.    #3
    Moderator cellophane's Avatar
    Join Date
    August 9, 2011
    Location
    Louisville, KY
    Posts
    5,491
    Current Local Time
    12:15 AM
    Quote Originally Posted by snowyweston View Post
    Anyone ever tried to schedule a Project Parameter applied to Stair Landings, Runs and/or Supports?

    You can certainly add one, and it'll show in the Types Properties, but it doesn't come up in the schedule's field list - at least not for me at the moment.
    When you add the parameter expand stairs and make sure it is applied to the Supports / Runs / Landings (blue arrow), not just Stairs and you should be able to schedule it (green arrow.)
    Attached Thumbnails Attached Thumbnails (Scheduling) Railing Hardware/Support &amp; Handrails-stairparams.png  

  4.    #4
    Moderator snowyweston's Avatar
    Join Date
    December 21, 2010
    Location
    C.LONDON
    Posts
    3,863
    Current Local Time
    05:15 AM
    Quote Originally Posted by cellophane View Post
    make sure
    Mate, some credit please!

    (Scheduling) Railing Hardware/Support &amp; Handrails-credit.png

    Looks like it could be an issue with making the parameter 'Type' based... which would just be a nonsense. And nonsense comes as no surprise.

    Further tests to follow...

  5.    #5
    Moderator cellophane's Avatar
    Join Date
    August 9, 2011
    Location
    Louisville, KY
    Posts
    5,491
    Current Local Time
    12:15 AM
    Quote Originally Posted by snowyweston View Post
    Mate, some credit please!

    Click image for larger version. 

Name:	credit.png 
Views:	9 
Size:	51.2 KB 
ID:	32068

    Looks like it could be an issue with making the parameter 'Type' based... which would just be a nonsense. And nonsense comes as no surprise.

    Further tests to follow...
    you never know... i forget little things like that all the time

    not sure about the type vs instance though - never tried.

  6.    #6
    Moderator snowyweston's Avatar
    Join Date
    December 21, 2010
    Location
    C.LONDON
    Posts
    3,863
    Current Local Time
    05:15 AM
    Quote Originally Posted by cellophane View Post
    never tried.
    & I have yet to.

    Setting it to Instance won't work (for me) - not this time anyway, as I'm aiming to pair it to <Keynote> and (still) don't have the chops for mixing Type/Instance lists in Dynamo (yeah, I'm slack)

    Given my idea is working all fine and dandy on all the core/key categories I (really) need it to, and since I can't ever recall tagging a run (?) I'm quite content to put this on the backburner.

  7.    #7
    Moderator cellophane's Avatar
    Join Date
    August 9, 2011
    Location
    Louisville, KY
    Posts
    5,491
    Current Local Time
    12:15 AM
    The only difference I can see between ours is that you are using a shared parameter, but I just tried it and didn't have any issues...

Similar Threads

  1. Joining handrails
    By Ecotech Kid in forum Architecture and General Revit Questions
    Replies: 0
    Last Post: June 12th, 2017, 01:43 PM
  2. Scheduling for Handrails
    By minosh in forum Architecture and General Revit Questions
    Replies: 1
    Last Post: June 1st, 2016, 02:07 PM
  3. Revit OpEd: Autodesk Hardware Selection Support Site
    By Revit OpEd in forum Blog Feeds
    Replies: 0
    Last Post: May 30th, 2015, 03:17 PM
  4. Replies: 0
    Last Post: November 30th, 2012, 02:15 AM
  5. Stair Handrails
    By Rabbs in forum Structure - General Questions
    Replies: 3
    Last Post: April 4th, 2012, 09:01 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •