    Project Base Point and Suvey Point

    I have been using Revit for a few months now, but am still unclear on where to set the Project Base Point and Survey Point for the project. Where should each be located? If a consultant's CAD background comes in far from the Survey Point should the background of survey point be moved?

  2. #2
    Senior Member
    Join Date
    December 16, 2010
    Posts
    563
    Current Local Time
    08:33 PM
    Easiest way to think of it is to move the session in revit to the right location.

    You go to the mountain, you don't make the mountain come to you.

    Make sure you are in plan view orientation "north geographic"
    Generally, you import the Survey plan using "automatic centre to centre"
    Then in your "manage" tab and "import coordinates" and select your linked file.

    You can leave your Survey point where it is but if the surveyor has specified one you can move your Survey point.
    Don't forget to UNPIN (using the paperclip icon) the Survey point and the project point.
    Once unpinned, move your project base point (the circle) to the new location - eg. corner of the building or known point.
    Now you can repin it. Do the same process for your Survey base point if you wish to relocate it and verify the coordinates with the Survey plan coordinates.
    Also don't forget to set the elevation...
    Last edited by Karalon10; May 23rd, 2017 at 07:35 AM.
    cganiere likes this.

  3. #3
    Junior Member
    Join Date
    January 18, 2017
    Location
    Eden Prairie, MN
    Posts
    35
    Current Local Time
    05:33 AM
    Thanks Karalon. Very helpful

  4. #4
    Member chris.macko's Avatar
    Join Date
    April 12, 2011
    Location
    Chicago, IL
    Posts
    379
    Current Local Time
    05:33 AM
    There are actually 3 origin points in Revit. The base point, survey point, and origin point. The origin point can't really be seen, but when you import anything "origin to origin", this is what is being used. If any of your model is more than 20 miles away from this point, things start jumping around and becoming generally inaccurate. Just something to keep in mind when you're moving the survey point around to align with a cad drawing.

  5. #5
    Junior Member
    Join Date
    January 18, 2017
    Location
    Eden Prairie, MN
    Posts
    35
    Current Local Time
    05:33 AM
    Thanks Chris. When importing a CAD drawing, is it best to use Center to Center as opposed to Origin to Origin?

  6. #6
    Moderator snowyweston's Avatar
    Join Date
    December 21, 2010
    Location
    C.LONDON
    Posts
    3,668
    Current Local Time
    11:33 AM
    Or you could go the long way round...
    Project Base Point and Suvey Point-long-way-round.jpg
    CanadianStructEng likes this.

  7. #7
    Member chris.macko's Avatar
    Join Date
    April 12, 2011
    Location
    Chicago, IL
    Posts
    379
    Current Local Time
    05:33 AM
    Quote Originally Posted by krickabaugh View Post
    Thanks Chris. When importing a CAD drawing, is it best to use Center to Center as opposed to Origin to Origin?
    It really depends on the CAD file. A lot of files generated by civil software in particular have origin points way off in space to correspond to some survey datum. If you try to bring that in it will probably default to center-to-center anyway. If the file is something you control, the base point can be something meaningful and origin-to-origin makes sense. Of course in a perfect world you're not bringing in any CAD files in the first place.

  8. #8
    Junior Member
    Join Date
    June 4, 2017
    Posts
    7
    Current Local Time
    10:33 AM
    Hi,
    How you got that
    Please, give more explanation

  9. #9
    Junior Member
    Join Date
    June 4, 2017
    Posts
    7
    Current Local Time
    10:33 AM

  10. #10
    Senior Member biff's Avatar
    Join Date
    June 13, 2011
    Location
    Australia
    Posts
    590
    Current Local Time
    08:33 PM
    Looking at that building coder link, i see he is using snoop. Is that available during the initial install/setup in the bim tools part? Or part of developer kit?
    Last edited by biff; June 18th, 2017 at 03:17 AM.

Page 1 of 2 12 LastLast

Similar Threads

  1. Adjust project base point vs survey point in elevation
    By iru69 in forum Architecture and General Revit Questions
    Replies: 7
    Last Post: June 9th, 2016, 03:31 PM
  2. Project Base Point | Survey Point | Absolute Elevation Issue
    By siqbal16 in forum Structure - General Questions
    Replies: 1
    Last Post: March 29th, 2016, 10:16 PM
  3. Replies: 0
    Last Post: October 23rd, 2015, 04:15 PM
  4. Replies: 0
    Last Post: August 10th, 2015, 12:15 PM