Donate Now Goal amount for this year: 2500 USD, Received: 1869 USD (75%)

Results 1 to 5 of 5

Thread: 4 Visibility Options with Unique Serial Numbers Appearing in a Schedule

  1. #1
    New Member
    Join Date
    November 15, 2014
    Posts
    2
    Current Local Time
    10:57 PM

    4 Visibility Options with Unique Serial Numbers Appearing in a Schedule

    Hi All,


    Can anyone please help me with this?

    - I need to have 4 visibility options
    - Each of the 4 options have varying serial numbers
    - When an option is selected, the rest should automatically be unselected
    - When an option is selected, its serial number should be displayable in a project schedule


    Thanks in advance.

    Andre

  2. #2
    Forum Addict GMcDowellJr's Avatar
    Join Date
    December 21, 2010
    Location
    Phoenix, AZ
    Posts
    2,627
    Current Local Time
    07:57 AM
    You'll need a new parameter (most likely an Integer) where you ask the user to select 1-4 (or whatever) and change visibility based on the result. The serial number would be an if/then based on the integer as well.

  3. #3
    Senior Member Alex Page's Avatar
    Join Date
    December 13, 2010
    Location
    Wellington, New Zealand
    Posts
    656
    Current Local Time
    02:57 AM
    Or - just setup the types correctly and give the types a valid name so your users don't need to select an option, they just select the correct family type

  4. #4
    Member
    Join Date
    September 16, 2015
    Location
    Darwin, Australia
    Posts
    171
    Current Local Time
    01:27 AM
    Yep, I'd just go with family types. I've pulled out enough hair recently trying to set up multiple Yes/No visibility parameters to work around each other.

  5. #5
    New Member
    Join Date
    November 15, 2014
    Posts
    2
    Current Local Time
    10:57 PM
    Thank you guys for the replies. I tried creating the options using 4 integers and loaded them in a project and created different family types and they all work great. Thank you.

Similar Threads

  1. Room Schedule - Project Parameter with Multiple Input Options?
    By sbopp in forum Architecture and General Revit Questions
    Replies: 0
    Last Post: December 18th, 2015, 04:46 PM
  2. Room/Space Names and numbers within Mechanical schedule
    By mcole254 in forum MEP - General
    Replies: 5
    Last Post: September 23rd, 2014, 01:19 PM
  3. schedule links and design options
    By elton williams in forum Architecture and General Revit Questions
    Replies: 4
    Last Post: November 14th, 2013, 08:18 PM
  4. schedule design options
    By elton williams in forum Architecture and General Revit Questions
    Replies: 0
    Last Post: October 29th, 2013, 01:28 AM
  5. What Revit Wants: Adobe CS2 Downloads and Serial Numbers
    By luke.johnson in forum Blog Feeds
    Replies: 0
    Last Post: January 8th, 2013, 03:45 AM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •